Waitemata DHB, Silverdale, April/May 2020
During the 2020 Covid-19 lockdown, Central Steel Framing contributed to the current cause by providing steel framing for COVID testing cabins at the Waitemata DHB. We are pleased to be helping out alongside Coastal Cabins Ltd.
Run at night and assembled the next day
The 4 testing units (8 metre and 9 metre cabins) were run at night in our workshop in Taupo, then delivered to the Waitemata DHB and assembled during the day by a different crew, ensuring we met the Covid-19 regulations.